Read-only demo
Live updates on
Total cost billed to jobs
$79.5k
Sum of Cost.Total
Labor hours logged
303
Sum of ActualLaborHours

Work by technician specialization

Who the work is assigned to.

AssignedToTechnician.Technician.Specialization

Work by site borough

PerformedAtSite.Site.Address.Borough

Work by customer industry

RequestedByCustomer.Customer.Industry

Equipment serviced

Equipment type of the asset each work order concerns.

ServicesAsset.Asset.EquipmentType
HVAC: 33 (34%)Electrical: 21 (21.6%)Refrigeration: 18 (18.6%)Elevator: 16 (16.5%)Other: 9 (9.3%)97 work orders
  • HVAC 33 34%
  • Electrical 21 22%
  • Refrigeration 18 19%
  • Elevator 16 16%
  • Other 9 9%

Status

Status
Completed: 80 (81.6%)New: 5 (5.1%)Scheduled: 5 (5.1%)Cancelled: 4 (4.1%)In Progress: 3 (3.1%)On Hold: 1 (1%)98 work orders
  • Completed 80 82%
  • New 5 5%
  • Scheduled 5 5%
  • Cancelled 4 4%
  • In Progress 3 3%
  • On Hold 1 1%

Cost by status

Sum of total cost per status (USD).

Status › sum Cost.Total

Priority

Priority

Work type

WorkType
Preventive Maintenance: 44 (44.9%)Repair: 24 (24.5%)Emergency: 15 (15.3%)Inspection: 11 (11.2%)Installation: 4 (4.1%)98 work orders
  • Preventive Maintenance 44 45%
  • Repair 24 24%
  • Emergency 15 15%
  • Inspection 11 11%
  • Installation 4 4%
Something went wrong and the page lost its connection. Reload ×